top of page

Get a quote for your upcoming project

Production Process Of Cold Drawn Seamless Steel Pipes

  • Apr 3, 2025
  • 1 min read

1. Raw material preparation: High quality steel billets are selected as raw materials, and after passing preliminary inspection, they enter the production line.

2. Hot rolling: Steel billets are rolled by a rolling mill at high temperatures to form capillary tubes.

3. Acid washing: Remove oxide scale and impurities on the surface of the capillary tube through acid washing.

4. Cold drawing: Cold drawing the pickled tube to gradually reduce the thickness of the tube wall, improve surface quality, and achieve the required specifications and dimensions.

5. Annealing: Cold drawn steel pipes undergo annealing treatment to eliminate internal stress and improve their toughness and flexibility.

6. Straightening: After annealing, the steel pipe is straightened to achieve the required straightness according to the standard.

7. Inspection of packaging: The final product undergoes strict inspection, and after passing the inspection, it undergoes rust prevention treatment and packaging.

Comments


Commenting on this post isn't available anymore. Contact the site owner for more info.
bottom of page